| Availability: | |
|---|---|
| Quantity: | |
Advantages of LVL scaffolding plank:
1. LVL board Comparison with traditional solid wood planks
Stronger and more stable: No knots, no grain patterns, no cracks, uniform performance, and high safety factor.
Dimensional stability: Strict humidity control during pressing, extremely strong anti-deformation ability, and no deformation even after repeated assembly and disassembly.
Waterproof and corrosion-resistant: Phenolic glue + waterproof paint, excellent outdoor weather resistance, and less prone to rot.
Many turnover cycles: Can be reused 50+ times, with lower overall cost.
LVL board Comparison with steel planks
Lighter weight: Approximately 1/3 of steel planks, high efficiency in transportation / assembly/disassembly, and less effort for workers.
Good insulation: No electrical conductivity risk, suitable for electrical work scenarios.
Excellent anti-slip performance: Surface polished / embossed, safer in slippery environments.
High cost-effectiveness: Total procurement + usage cost lower than steel planks.
Technical Specifications
Material | Radiata pine/ Spruce |
Glue | WBP melamine / phenolic glue |
Thickness | 38mm/40mm/42mm or customized |
Width | 225mm/230mm/235mm or customized |
Length | 1.5m/2.9m/3.9m/3.95m/4.0m or customized |
Density | 560~740kgs/cbm |
Standard | OSHA/ BS2482/AS1577 |
Packing | Seaworth Pallet packing |
End protection | Color painting, or with metal cover |
LVL scaffold board, also known as laminated veneer lumber , is a temporary load-bearing board specifically designed for high-altitude operations on construction sites. It is a replacement for solid wood pedals and is widely used in construction and infrastructure worldwide. Lay the LVL foot pedal on the plate buckle, bowl buckle, and horizontal bar of the portal steel pipe scaffold to form a continuous walkway for bricklayers, painters, curtain wall installers, and water and electricity workers to stand and carry workers, ash buckets, bricks, tools, and materials.
The wooden scaffold board must be fully placed on the two horizontal bars of the scaffold, with a lap length of ≥ 10cm at both ends. It is strictly prohibited to overhang or only place one side; It is prohibited to cut or saw short LVL scaffold planks, which can damage the waterproof edge sealing of the end and the internal single board structure, greatly reduce the load-bearing capacity, and easily cause delamination and fracture; Replace the corresponding specification board directly if the length is not suitable. Outdoor stacking should be covered with waterproof tarpaulin, and the bottom should be padded with wooden blocks to prevent moisture from seeping upwards from the ground. After construction on rainy days, the surface of the board should be cleaned of water in a timely manner. Long term soaking in water will reduce the adhesive strength and cause bulging and layering
We provide talored fulservice solutions for commercial project contractors and bulk buyers.
Q: What are the execution standards for LVL scaffoling plank?
A: China: GB 15831; United States: OSHA 1926; Europe: BS 2482; Australia and New Zealand: AS/NZS 1577
Q: How many times can the LVL scaffolding plank be reused?
A: If used and stored properly, it can be reused about 50 times
Q: Can logo be printed on the LVL scaffold board?
A: Yes,customer's logo and production date can be embossed on the edges on the board
